Our Greenergy team write tips and tricks for better tomorrow!

Read about green smart solutions

The Extractive Sector Transparency Measures Act (ESTMA) came into force on June 1, 2015 and regulates the reporting of local and foreign government payments by Canadian companies involved in extraction and exploration of resources. The Act was introduced to increase transparency in the Canadian extractive sector and contribute to international efforts to fight corruption, by...

Share on:

Murray River – Dye Tracer Study Conuma Resources will be conducting a dye tracer study in the Murray River as part of ongoing environmental monitoring and water quality research. This study involves the controlled release of a non-toxic, environmentally safe fluorescent dye into the river system. The dye is widely used in water surface studies...

Share on:
Willow Creek Wins Prestigious John Ash Award for Safety Excellence

Conuma is proud to announce that our Willow Creek team has received the 2024 John Ash Award, presented by the BC Ministry of Mining and Critical Minerals. This award recognizes the mine in British Columbia with the lowest injury-frequency rate in its category. This honour highlights the site’s strong safety culture and unwavering commitment to workplace...

Share on:
Conuma Resources Achieves Major Milestone at Quintette Preparation Plant

Tumbler Ridge, British Columbia, February 6, 2025 – Conuma Resources Ltd. (“Conuma”) has achieved a significant milestone with the installation and commissioning of the second module at its Quintette Mine’s coal handling and preparation plant on January 27, 2025. The new module, with a throughput capacity of 400 ROM tonnes per hour, will operate continuously...

Share on:
MLA Larry Neufeld Visits Quintette Mine

In November, Conuma welcomed Larry Neufeld, MLA for South Peace, to the Quintette site. This visit marked a pivotal moment, offering MLA Neufeld an opportunity to witness firsthand the impressive strides made in restarting mine operations. Reflecting on his visit, MLA Neufeld praised the Conuma team, stating, “I am impressed by the progress made over...

Share on:
Willow Creek Mine Surpasses One Million Hours Without Lost Time Injury

Willow Creek Mine has achieved another extraordinary milestone, reaching over one million hours without a lost time injury (LTI) as of September 30th. This accomplishment over the last nine months matched Willow Creek Mine’s equally impressive record of completing 12 months without an LTI. This exceptional result reflects the Willow Creek team’s unwavering commitment to...

Share on:
Quintette Ships its First Coal

The first train of steelmaking coal left Quintette Mine on September 18, the first shipment from Quintette in over two decades. This event marks the beginning of a new era for Conuma, showcasing the dedication and teamwork across all levels of Conuma. Each Conuma employee has had a role in making this possible, an achievement...

Share on: